01
The challenge
The company needed men's shirts in several fabric lines, with several top-up orders.
02
Requirements
- Men's shirts in three Kevinlli fabric lines (S01, S02, S03) with many colour codes; chest logo and sleeve embroidery in the first order; cotton shirts added in 2023.
03
Solution
- The first order (May 2019) covered 27 men's shirts (13 S01, 5 S02, 9 S03) with an embroidered logo. 2019 also brought more shirts and 2 trousers; 2020, 25 shirts; 2022, two orders totalling 28 shirts; 2023, 6 cotton shirts in 6 different codes.
04
Process
Following Mon Amie's standard six steps: consultation → design & cloth → sample approval → individual measuring → production → delivery & three-year warranty. See the process →
05
Outcome
- Across 8 orders from 2019 to 2023, Daewon Chemical Vina received more than 90 men's shirts.

Facing a similar challenge?
Tell us your headcount and timeline. A consultant arranges a visit with real swatches and options in your brand identity — within 24 working hours.


